CURVES Italy/Sardinia
Volume 23
- Great photos with stunning perspectives
- Dream roads, dream beaches, beautiful country roads
- Maps, route recommendations and hotel tips
If you were to build the perfect CURVES island in the Mediterranean, then it would probably look something like this: fantastic panoramic roads with fine curves and sea views, every few kilometres a new dream beach with crystal clear water and small towns in between with an Italian way of life and Mediterranean nature.
CURVES puts it to the test and explores the second largest Mediterranean island: Stefan Bogner circles the Italian holiday paradise with a lot of soulful driving and tops off his road trip with a varied program: colourful cities, restaurants for gourmets and insider tips from the locals. Italian way of life in island format!
Text in English and German.
- Publisher
- Delius Klasing
- ISBN
- 9783667129543
- Published
- 7th Oct 2024
- Binding
- Paperback / softback
- Territory
- World excluding Germany, Switzerland and Austria
- Size
- 280 mm x 211 mm
- Pages
- 288 Pages
- Illustrations
- 332 color
- Name of series
- Curves
Distributed by ACC Art Books
Our Catalogues
Please log-in or create an account to see your recent items.







